Quick Links
Welcome to SAUTER Group
If you have any questions or need to talk to an expert,
we will gladly direct you to the right person.
Country Selection
Thermia Palace, Piestany
Hotel
Project/building: | Thermia Palace hotel and spa |
User: |
|
Place and country : | Island of Piestany, Slovakia |
Description of project:
The Thermia Palace was built in 1910-1912. In the presence of the president of Slowakia, Ivan Gasparovic, and his wife Silvia, the fully renovated Thermia Palace hotel in Piestany was opened on 27th April 2007. This extraordinary structure, with its unique Art Nouveau architecture, is situated in the south part of the island near the thermal springs and the curative mud springs.
The 111-room Thermia Palace hotel is the first five-star spa resort in Slovakia.
Task:
Sauter's EY3600 was selected as the building management system. Each of the rooms is fitted with a DDC intelligent unitary controller to ensure the highest level of comfort for guests. The building automation system is linked to the hotel reservation system and is integrated via BACnet into the overall system for the whole of the spa island.
System employed: EY3600 novaPro integrated into a higher-level
management system via BACnet
Information materials:



